The Chinese version ofEnglish

Basket Mill step about the safe operation


Xiao Bian teach you how to safely operate basket mill.
A test
1, ready to work before commissioning.
2, each part inspection Basket Mill is firmly installed.
3, the direction of rotation of each machine should be running direction of the arrow (should jog test direction).
4. Check basket mill cooling water whether it is smooth.
5, the belt before starting and adaptation, after working 50 hours, and then transferred positive again.
6, from the top of the cylinder joined the grinding media.
7, start feed pump, enter the material needs to be on the top sieve the material before starting the host.
8, after a long time stop, when the re-start, often due to the material in the settling of solid particles and the grinding media and the "card" tight dispersion, in particular a viscous material at a lower temperature when the "brake" phenomenon is particularly serious. In this case, move the motor can not start when the application of hand spindle pulley "CART" supplemented to enter a small amount of the material is the ability of a solvent to dissolve, the material was dissolved in dilute loose before starting. In short, can not be forced to start, in order to avoid damage to the appliance and body.
9, parking a long time, you should clean up the dry material of the screen.
10, wash dispenser, only slightly, intermittently rotated, because the dispersion and grinding media in the cleaning solution running quickly wear easily broken.
11, using a new grinding media should be sieved to remove impurities fragments and other foreign matter.
Home | About us | Products | News | Service | Contact Us